Custers Hydraulica B.V. Venray NL
26 maart 2020 www.custers.nl 22
Fig.43
18: Place both 8-rung frames;
19: Place locking pins between the
frames themselves;
20: Place two Safe Guard guardrail frames
on the upper rung and click both
diagonal ledgers in place on the 5
th
rung of the frame in question;
Fig.44
21: Place the platform with hatch (on the
5
th
rung from the top); slide both
blow-away protections under the
rung;
Fig.45
22: Climb to the next level through the
hatch;