EasyManua.ls Logo

Daewoo Mega 200-V - Page 131

Daewoo Mega 200-V
200 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
022-00028AE Operation and Maintenance Manual Inspection, Maintenance and Adjustment 4-23
MEGA 200-VTC
1. Following fittings are greased daily, or every 10 hours, for first 100 hours of operation to comply with
new machine break-in requirements. After that, greasing should be done every 50 hours. If bucket is
being used in water, grease fittings immediately after machine is removed from water.
A: Bucket hinge pins, 2 locations on
each side of bucket. Arm link
connecting pins, 2 locations. (Figure
41)
C
B
DA
BFO0030P
Figure 40
Figure 41

Table of Contents

Other manuals for Daewoo Mega 200-V

Related product manuals