EasyManua.ls Logo

Daikin Altherma EHBH08DA6V7 - 6 Preparation; 6.1 Overview: Preparation; 6.2 Preparing the installation site; 6.2.1 Installation site requirements of the outdoor unit

Daikin Altherma EHBH08DA6V7
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 | Preparation
Installer reference guide
49
ERGA04~08DAV3(A) + EHBH/X04+08DA*V7
Daikin Altherma 3 R W
4P618958-1 – 2020.03
6 Preparation
6.1 Overview: Preparation
This chapter describes what you have to do and know before going on-site.
It contains information about:
Preparing the installation site
Preparing the refrigerant piping
Preparing the water piping
Preparing the electrical wiring
6.2 Preparing the installation site
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
Choose an installation location with sufficient space for carrying the unit in and out
of the site.
WARNING
The appliance shall be stored in a room without continuously operating ignition
sources (example: open flames, an operating gas appliance or an operating electric
heater).
WARNING
DO NOT reuse refrigerant piping that has been used with any other refrigerant.
Replace the refrigerant pipes or clean thoroughly.
6.2.1 Installation site requirements of the outdoor unit
INFORMATION
Also read the following requirements:
General installation site requirements. See the "General safety precautions"
chapter.
Refrigerant piping requirements (length, height difference). See further in this
"Preparation" chapter.
Mind the following spacing guidelines:
≤1200
>250
>250
>250
>350
>350
(mm)(mm)
a
b
b
a
a Air outlet
b Air inlet

Table of Contents

Other manuals for Daikin Altherma EHBH08DA6V7

Related product manuals