EasyManua.ls Logo

Daikin Altherma EHBH08DA6V7 - 7 Installation; 7.1 Overview: Installation; 7.2 Opening the units; 7.2.1 About opening the units

Daikin Altherma EHBH08DA6V7
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 | Installation
Installer reference guide
67
ERGA04~08DAV3(A) + EHBH/X04+08DA*V7
Daikin Altherma 3 R W
4P618958-1 – 2020.03
7 Installation
7.1 Overview: Installation
This chapter describes what you have to do and know on-site to install the system.
Typical workflow
Installation typically consists of the following stages:
1 Mounting the outdoor unit.
2 Mounting the indoor unit.
3 Connecting the refrigerant piping.
4 Checking the refrigerant piping.
5 Charging refrigerant.
6 Connecting the water piping.
7 Connecting the electrical wiring.
8 Finishing the outdoor installation.
9 Finishing the indoor installation.
INFORMATION
Depending on the units and/or the installation conditions, it might be necessary to
connect electrical wiring before you can charge refrigerant.
7.2 Opening the units
7.2.1 About opening the units
At certain times, you have to open the unit. Example:
When connecting the refrigerant piping
When connecting the electrical wiring
When maintaining or servicing the unit
DANGER: RISK OF ELECTROCUTION
Do NOT leave the unit unattended when the service cover is removed.
7.2.2 To open the outdoor unit
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
See "7.5.8 To connect the refrigerant piping to the outdoor unit" [4 83] and
"7.9.6To connect the electrical wiring to the outdoor unit"[494].

Table of Contents

Other manuals for Daikin Altherma EHBH08DA6V7

Related product manuals