EasyManua.ls Logo

Daikin Altherma EHBH08DA6V7 - 7.7 Charging refrigerant; 7.7.1 About charging refrigerant

Daikin Altherma EHBH08DA6V7
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 | Installation
Installer reference guide
86
ERGA04~08DAV3(A) + EHBH/X04+08DA*V7
Daikin Altherma 3 R W
4P618958-1 – 2020.03
a d
j
b
f
e
c
g h i
h
a Pressure meter
b Gauge manifold
c Low pressure valve (Lo)
d High-pressure valve (Hi)
e Charging hoses
f Vacuum pump
g Service port
h Valve lids
i Gas stop valve
j Liquid stop valve
1 Vacuum the system until the pressure on the manifold indicates −0.1 MPa
(−1bar).
2 Leave as is for 4-5minutes and check the pressure:
If the pressure… Then…
Does not change There is no moisture in the system.
This procedure is finished.
Increases There is moisture in the system. Go
to the next step.
3 Vacuum the system for at least 2 hours to a manifold pressure of −0.1 MPa
(−1bar).
4 After turning the pump OFF, check the pressure for at least 1hour.
5 If you do NOT reach the target vacuum or CANNOT maintain the vacuum for
1hour, do the following:
Check for leaks again.
Perform vacuum drying again.
NOTICE
Make sure to open the stop valves after installing the refrigerant piping and
performing vacuum drying. Running the system with the stop valves closed may
break the compressor.
INFORMATION
After opening the stop valve, it is possible that the pressure in the refrigerant piping
does NOT increase. This might be caused by e.g. the closed state of the expansion
valve in the outdoor unit circuit, but does NOT present any problem for correct
operation of the unit.
7.7 Charging refrigerant
7.7.1 About charging refrigerant
The outdoor unit is factory charged with refrigerant, but in some cases the
following might be necessary:

Table of Contents

Other manuals for Daikin Altherma EHBH08DA6V7

Related product manuals