EasyManua.ls Logo

Daikin ERQ - Hot Start Control (in Heating Operation Only)

Daikin ERQ
260 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE09-05 Outline of Control
Function 41
6.3 Hot Start Control (In Heating Operation Only)
At startup with thermostat ON or after the completion of defrosting in heating operation, the AHU
fan is controlled to prevent cold air from blasting out and ensure startup capacity.
[Detail of operation]
During hot start, fan on is carried out when Tc is A°C or after B minutes (see “Field Setting”).
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Related product manuals