ESIE09-05 Test Operation
Test Operation 89
1.1.6 Confirmation on Normal Operation
Conduct normal unit operation after the check operation has been completed.
(When outdoor air temperature is 24°CDB or higher, the unit can not be operated with
heating mode. See the installation manual attached.)
Confirm that the AHU/outdoor units can be operated normally.
(When an abnormal noise due to liquid compression by the compressor can be heard, stop
the unit immediately, and turn on the crankcase heater to heat up it sufficiently, then start
operation again.)
Operate AHU one by one to check that the corresponding outdoor unit operates.
Confirm that the AHU discharges cold air (or warm air).