EasyManua.ls Logo

Daikin EWAQ032BAW - Page 206

Daikin EWAQ032BAW
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE11-05 Options
Service Procedure 195
5.2.3 PCB
Names of parts
and functions
1 Power supply connector D1, D2
Connect to adaptor power supply connector on hydrobox unit or BS-unit.
2 Switch SS2. Do not change this setting (OFF).
3 Switch SS1. Do not change this setting (BOTH).
4 Microcomputer normal monitor (HAP: GRN)
This lamp is blinking when the microcomputer is operating normally.
5 Address setting DIP switches (DS1, DS2)
Setting the demand address.
6 Demand, low noise input terminal block (X1M)
Connects control input from electrical appendices (host computer monitor panel,
demand controller, timer, etc.).
7 Terminal block for transmission (F1, F2)
Refer to the wiring diagram.
For details, refer to the wiring diagram located on the rear of the unit service panel.

Table of Contents

Related product manuals