EasyManua.ls Logo

Daikin FTXS09HVJU - Removal of PCB; Electrical Box

Daikin FTXS09HVJU
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RXS15/18/24DVJU, RX15/18/24FVJU SiUS04-904
Removal Procedure 235
4.3 Removal of PCB / Electrical Box
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembly work.
Step
Procedure Points
Remove the top panel and
the front panel.
1. Removal of the right side
panel.
Terminal strip number
black (1) ----- power supply
white (2) ----- power supply
red (3) ----- transmission
yellow / green ( ) ----- ground
1
Release the 3 connection
wirings and the 2 ground
wires.
2
Remove the 3 screws of
the right side panel.

Table of Contents

Other manuals for Daikin FTXS09HVJU

Related product manuals