SiBE05-722EE
Trial Operation and Field Settings 115
Part 7
Trial Operation and
Field Settings
1. Tips for Servicing ................................................................................116
1.1 Pump Down Operation .........................................................................116
1.2 Forced Cooling Operation ....................................................................116
2. Trial Operation ....................................................................................118
3. Field Settings ......................................................................................119
3.1 When 2 Units are Installed in 1 Room..................................................119
3.2 Facility Setting Jumper (cooling at low outdoor temperature) ..............120
3.3 Jumper and Switch Settings.................................................................121
4. Silicone Grease on Power Transistor / Diode Bridge..........................122