20 | Electrical installation
Installer and user reference guide
112
RXYSA4~6A7V/Y1B
VRV 5-S system air conditioner
4P600330-1D – 2023.02
20.2 To connect the electrical wiring to the outdoor unit
NOTICE
â–ª Follow the wiring diagram (delivered with the unit, located at the inside of the
service cover).
â–ª Make sure the electrical wiring does NOT obstruct proper reattachment of the
service cover.
1 Remove the service cover. See "17.2.2To open the outdoor unit"[476].
2 Strip insulation (20mm) from the wires.
a b
a Strip wire end to this point
b An excessive strip length may cause electrical shock or leakage
3 Connect the interconnection cable as follows:
F1 F2 F1 F2 F1 F2
F1 F2 F1 F2 F1 F2
a
a
b
b
V Y
X4M
TO IN/D
X2M
TO OUT/DTO IN/D
a
a a a
a a
a
a Interconnection cable (see "20.1.6Specifications of standard wiring
components"[4111] for wiring requirements)
b Terminal board (field supply)
c Shielded cable
NOTICE
â–ª Use shielded wire for the interconnection cable.
â–ª Y1 only: connect the earth (a) to the support frame of the terminal X2M.
a
4 Connect the power supply as follows: