9 | Maintenance and service
Installer and user reference guide
41
RXYSA4~6A7V/Y1B
VRV 5-S system air conditioner
4P600330-1D – 2023.02
WARNING
â–ª Do NOT modify, disassemble, remove, reinstall or repair the unit yourself as
incorrect dismantling or installation may cause an electrical shock or fire. Contact
your dealer.
â–ª In case of accidental refrigerant leaks, make sure there are no naked flames. The
refrigerant itself is entirely safe, non-toxic and mildly flammable, but it will
generate toxic gas when it accidentally leaks into a room where combustible air
from fan heaters, gas cookers, etc. is present. Always have qualified service
personnel confirm that the point of leakage has been repaired or corrected
before resuming operation.
9.4.3 Recommended maintenance and inspection cycles
Be aware that the mentioned maintenance and replacement cycles do not relate to
the warranty period of the components.
Component Inspection
cycle
Maintenance cycle
(replacements and/or repairs)
Electric motor 1 year 20,000 hours
PCB 25,000 hours
Heat exchanger 5 years
Sensor (thermistor, etc.) 5 years
User interface and switches 25,000 hours
Drain pan 8 years
Expansion valve 20,000 hours
Solenoid valve 20,000 hours
The table assumes the following conditions of use:
â–ª Normal use without frequent starting and stopping of the unit. Depending on the
model, we recommend not starting and stopping the machine more than 6
times/hour.
▪ Operation of the unit is assumed to be 10hours/day and 2,500hours/year.
NOTICE
â–ª The table indicates main components. Refer to your maintenance and inspection
contract for more details.
â–ª The table indicates recommended intervals of maintenance cycles. However, in
order to keep the unit operational as long as possible, maintenance work may be
required sooner. Recommended intervals can be used for appropriate
maintenance design in terms of budgeting maintenance and inspection fees.
Depending on the content of the maintenance and inspection contract,
inspection and maintenance cycles may in reality be shorter than listed.
9.4.4 Shortened maintenance and replacement cycles
Shortening of "maintenance cycle" and "replacement cycle" needs to be
considered in following situations:
The unit is used in locations where:
â–ª Heat and humidity fluctuate out of the ordinary.