18 | Piping installation
Installer and user reference guide
90
RXYSA4~6A7V/Y1B
VRV 5-S system air conditioner
4P600330-1D – 2023.02
2 Choose a piping route (a, b, c or d).
a Front
b Side
c Rear
d Bottom
INFORMATION
â–ª Remove the knockout hole (a) in the bottom plate or cover plate by tapping on
the attachment points with a flat head screwdriver and a hammer.
â–ª Optionally, cut out the slits (b) with a metal saw.
NOTICE
Precautions when making knockout holes:
â–ª Avoid damaging the casing and underlying piping.
â–ª After making the knockout holes, we recommend to remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
â–ª When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
3 Do the following:
â–ª Connect the accessory liquid pipe (a) to the liquid stop valve (brazing).
â–ª Connect the accessory gas pipe (b) to the gas stop valve (brazing).