EasyManua.ls Logo

Daikin VRV 5-S - Page 100

Daikin VRV 5-S
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 | Piping installation
Installer and user reference guide
100
RXYSA8~12AMY1B
VRV 5-S system air conditioner
4P752782-1A – 2024.02
a
b
c
INFORMATION
b b bb
a
a
Punch out the knockout (a) in the bottom plate or cover plate by tapping on the
attachment points with a flat head screwdriver and a hammer.
Optionally, cut out the slits (b) with a metal saw.
NOTICE
Precautions when making knockout holes:
Avoid damaging the casing and underlying piping.
After making the knockout holes, we recommend to remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
3 Do the following:
Connect the liquid pipe (a) to the liquid stop valve. (brazing)
Connect the gas pipe (b) to the gas stop valve. (brazing)
b
a
b
a
8 HP 10-12 HP

Table of Contents

Other manuals for Daikin VRV 5-S

Related product manuals