22 | Commissioning
Installer and user reference guide
146
RXYSA8~12AMY1B
VRV 5-S system air conditioner
4P752782-1A – 2024.02
22 Commissioning
CAUTION
See "3 Specific installer safety instructions" [4 14] to make sure commissioning
complies with all safety regulations.
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during commissioning
and hand-over to the user.
In this chapter
22.1 Overview: Commissioning ...................................................................................................................................................... 146
22.2 Precautions when commissioning.......................................................................................................................................... 146
22.3 Checklist before commissioning............................................................................................................................................. 147
22.4 Checklist during commissioning............................................................................................................................................. 148
22.5 About the SV unit test run...................................................................................................................................................... 149
22.6 About the system test run...................................................................................................................................................... 149
22.6.1 To perform a test run............................................................................................................................................. 149
22.6.2 Correcting after abnormal completion of the test run ......................................................................................... 150
22.7 To perform a SV/indoor unit connection check..................................................................................................................... 151
22.8 Operating the unit .................................................................................................................................................................. 153
22.1 Overview: Commissioning
After installation and once the field settings are defined, the installer is obliged to
verify correct operation. Therefore a test run MUST be performed according to the
procedures described below.
This chapter describes what you have to do and know to commission the system
after it is configured.
Commissioning typically consists of the following stages:
1 Checking the "Checklist before commissioning".
2 Performing a test run.
3 If necessary, correcting errors after abnormal completion of the test run.
4 Operating the system.
22.2 Precautions when commissioning
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING