EasyManua.ls Logo

Daikin VRV 5-S - Guidelines When Connecting the Electrical Wiring

Daikin VRV 5-S
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 | Electrical installation
Installer and user reference guide
120
RXYSA8~12AMY1B
VRV 5-S system air conditioner
4P752782-1A – 2024.02
NOTICE
Precautions when making knockout holes:
Avoid damaging the casing and underlying piping.
After making the knockout holes, we recommend to remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
a
b c
d
a Knockout hole
b Burr
c Remove burrs
d If there are any possibilities that small animals enter the system through the
knockout holes, close the holes with packing materials (to be prepared on-site)
20.1.4 Guidelines when connecting the electrical wiring
NOTICE
We recommend using solid (single-core) wires. If stranded wires are used, slightly
twist the strands to consolidate the end of the conductor for either direct use in the
terminal clamp or insertion in a round crimp-style terminal.
To prepare stranded conductor wire for installation
Method 1: Twisting conductor
1 Strip insulation (20 mm) from the wires.
2 Slightly twist the end of the conductor to create a "solid-like" connection.
Method 2: Using round crimp-style terminal
1 Strip insulation from wires and slightly twist the end of each wire.
2 Install a round crimp-style terminal on the end of the wire. Place the round
crimp-style terminal on the wire up to the covered part and fasten the
terminal with the appropriate tool.

Table of Contents

Other manuals for Daikin VRV 5-S

Related product manuals