User Guide PFM 1000
VU.E2.G1.02 | 9© Danfoss | 2019.02
Projects Project Management
The project management in the PFM 1000 measuring instrument makes the work in the real
technology easier. You can prepare the project you need to measure directly in the PFM 1000
measuring instrument. You can then store two values for each branch of the project - the initial status
of the branch before balancing and its status after balancing. From the data of the whole project you
can then print a report on the project status before balancing and the report on balancing.
For the project measurement you select the respective project and branch. The PFM 1000 measuring
instrument will set the valve and its preset automatically and you are ready for measuring. The
measured data will be again stored automatically in the project’s correct fields.
You can find in the Projects introductory screen two tabs - Projects a Branches.
Project Window, Project Tab
In the Project tab, the input data of the project is entered or measured, such as Project name, File
name for storing projects, Project input pressure. If the Common valve is used in the project, change
the position of the sliding button. Then, you have to specify and enter the Valve type and Initial
preset. Once the system is balanced, you can also specify and enter the Balanced status preset.