16 Installation
Two-post Flush-mount Configuration
1
For this configuration, the castings must be removed from the front side of
each ReadyRails assembly. See
Figure 4, item 1 on page 16. Use a Torx™
driver to remove the two screws from each front flange ear (on the switch
side of the rail) and remove each casting. Retain the castings for future
rack requirements. It is not necessary to remove the rear flange castings.
Figure 4. Two-post Flush-mount Configuration
2
Attach one rail to the front post flange with two user-supplied screws.
See Figure 4, item 2.

Other manuals for Dell Networking N4032

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell Networking N4032 and is the answer not in the manual?

Dell Networking N4032 Specifications

General IconGeneral
Rack Units1U
LayerLayer 3
ManageableYes
StackableYes
MAC Address Table Size32, 000 entries
Jumbo Frame SupportYes
Jumbo Frame Size9216 bytes
Input Voltage100-240 VAC
Operating Temperature0°C to 45°C (32°F to 113°F)
Uplink Ports8 x 10 Gigabit Ethernet 10GBASE-T
Power SupplyDual, hot-swappable
Operating Humidity10% to 90% non-condensing