For systems with a 4-cell battery:
Next steps
1. Install the system board.
2. Install the power button.
3. Install the power-adapter port.
4. Install the display assembly.
5. Install the touchpad.
6. Install the I/O board.
7. Install the UMA heat sink or discrete heat sink, whichever applicable.
8. Install the fan.
9. Install the speakers.
10. Install the wireless card.
11. Install the memory modules.
12. Install the M.2 2230 solid-state drive or M.2 2280 solid-state drive (whichever applicable).
Removing and installing Field Replaceable Units (FRUs)
135
136 / 156 135 / 154 136 / 156