iSCSI for TL-Series Tape Libraries
Figure 22 : Backup Jobs General Settings Screen
Finally, create the schedule for the backup job. Select the schedule tab from the backup wiz-
ard. Select the ‘Run according to schedule’ option and select the backup to occur every Sun-
day night at 8 pm using the calendar view. Now click ‘Submit’ and the job will be ready for
execution. The job will run on the next Sunday night at 8 pm.
Figure 23 : Backup Jobs Schedule Screen
The job can be monitored using the ‘Job Monitor’ tab from the Backup Exec main interface.
The incremental backups can be setup in a similar manner to the full backup that was just
created. The backup wizard is run to select the same data for backup. The differences be-
tween the full backup job and the incremental backup job will be:
Selecting ‘Incremental using Archive Bit (reset archive bit)’ as the backup method for files
Creating a schedule to run every night of the week at 8 pm excluding Sundays
16
SEPTEMBER 2008

Other manuals for Dell PowerVault TL2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell PowerVault TL2000 and is the answer not in the manual?

Dell PowerVault TL2000 Specifications

General IconGeneral
Number of Drives1 or 2
Number of Slots24
TypeTape Library
Drive TypesLTO-4, LTO-5, LTO-6
InterfaceSAS, Fibre Channel
Dimensions8.68 in (22.05 cm) x 19.0 in (48.26 cm) x 30.0 in (76.2 cm)
Tape Drive CompatibilityLTO-4, LTO-5, LTO-6
Power SupplyRedundant power supplies optional
Operating Temperature50°F to 95°F (10°C to 35°C)
Non-operating Temperature-40°F to 140°F (-40°C to 60°C)

Related product manuals