EasyManuals Logo

DEMAG DR Series User Manual

DEMAG DR Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
21491244.p65/201204
14
Overview of the necessary assembly work.
The following illustarations show the general work steps.
For correct assembly observe the specifications in the corresponding
Operating instructions: EKDR Pro 3 - 5 - 10 214 725 44
Operating instructions: EKDR Com 3 - 5 – 10 214 916 44
1
4
6
3
2
5
7
5
4/1 reeving
3.1.1 Assembling trolleys of the 3,
5 and 10 range
3 Overview of DR rope hoist assembly
3.1 Adjusting EKDR Pro/-Com 3 – 5 – 10 low-headroom monorail hoists,
4/1, 2/1 and 4/2 rope reeving
2/1 reeving
42576445.eps
4/2 reeving
EKDR Pro 10
42063545.eps
42583644.eps
42584244.eps
Safely support the travel unit, before you place it onto the
girder in order to avoid any danger due to
crushing hazard
shearing hazard.
This support may only be removed after supporting roller
(6) has been adjusted.
Slide wheel legs (1) – travel motor side – on connecting rods
(2 + 3)(loosen threaded pin (5) before).

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DEMAG DR Series and is the answer not in the manual?

DEMAG DR Series Specifications

General IconGeneral
BrandDEMAG
ModelDR Series
CategoryConstruction Equipment
LanguageEnglish

Related product manuals