EasyManua.ls Logo

DGSHAPE DE-3 - Before Starting Operations; Performing Spindle Run-In (Warm-Up)

DGSHAPE DE-3
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Performing Spindle Run-in (Warm-up)
Perform run-in to stabilize the rotation of the spindle. This operation manually starts and stops rotation of the
spindle. You perform the operation using the handy panel.
Procedure
A
Close the front cover.
B
Press [ENTER/PAUSE].
C
On the main screen, press [SPINDLE].
The cursor moves to [S], and the spindle rotating speed can be changed.
SPINDLE
ON/OFF
Before Starting Operations
38

Other manuals for DGSHAPE DE-3