Dialab GmbH
Operator's Manual DIAcheck series Rev-4 Page 21
2.3 FIRST INSTALLATION
Inspect the packaging of the DIAcheck series and accessories for any visible external
damage. If the packaging is damaged, contact the transport company so that any damage
to the device or accessories can be assessed.
The instrument is ready to use and don’t need a specific procedure.
First installation procedure:
1. Unpack and place instrument in conformity with conditions of operation (see previous
chapter).
2. Install assessory (Protection foil, printer, barcode, Tecam – see next chapters)
3. Plug in power 5V.
4. Wait until green Status (approx. 15 min). The instrument is now ready to use.
5. Register instrument online for start of warranty period.
6. Activate 500 cuvettes (see chapter-5 “ticket system”).
Keep the original packaging material for purposes of later transport
maximum length of cables to external devices like printer, barcode or LIS
must be less than 3m to keep compliance with EMC