Do Not Operate Unless:
√ Before using the machine, it is necessary
to understand and apply the fundamental
principles regarding the working of the
machine in the safety conditions contained
in this Operator's Manual.
1 Avoid hazard situations.
2 Always carry out the pre-operative
inspection.
Read and understand the pre-operative
inspection before proceeding with the
next section.
3 Check the work area.
4 Always carry out functional test before
using the machine.
5 Use the machine only for the purposes
for which it is designed: operating
instructions.
Fundamental elements of
pre-operative inspection
The operator is responsible for carrying out the
pre-operative inspection and routine
maintenance.
The pre-operative inspection is a visual
inspection carried out by the operator before
every work shift. The inspection must be
carried out on the machine to check for faults
before the operator proceeds with testing the
functions.
The pre-operative inspection is also meant to
establish if routine maintenance procedures
are necessary. The operator must only carry
out the routine maintenance specified in this
Manual.
If damage or unauthorized modification is
found on the machine differing from the
original conditions, mark and put the machine
out of service.
The repairs must be done only by qualified
technical personnel, according to the
manufacturer's technical specifications. After
completing the repairs, the operator must
repeat the pre-operative inspection before
testing the functions.
The scheduled maintenance must be carried
out by qualified technical personnel, according
to the manufacturer's technical specifications
and the requirements listed in the Operation
and Maintenance Manual of this machine.