The correct operation of outreach- and overload limit switches RK4 and RK5 must be
done before test loading!
(I)
1. Place the lift on an even surface with good carrying capacity. Drive the outriggers to their
lowestposition(theminimumsupportwidth).
2. Raise the boom, turn it to the side from the transport support and lower it to the ground.
3. Putaweighedloadof215kgontheplatform(I).
4. Lifttheboomtoashighasitgoesandextendthetelescopetoitsfulllength(maximum
liftingheight).
5. Lower the boom until the safety device stops the movement.
6. Turntheboomroundover360°.
7. Retract the telescope and lower the boom to a horizontal position.
8. Extend the telescope until the safety limit switch RK4 stops the movement.
9. Compare the outreach with the reach diagram. If necessary, readjust according to the
instructions“Adjustmentoftheoutreachandoverloadlimitswitches”(seepoint“Regular
servicing”).
10. Establishthestandingstabilityinthissituationbyturningtheliftroundover360°.
(II)Carryoutthesameprocedurewithaplatformloadof80kg
Check the structures after test loading.
Aftertheabovementionedtestloadings(caseIandcaseII)andthesubsequentinspection
havebeencompletedwithoutndinganydefectsinthestructureorstabilityofthelift,the
lift may be used inside the permitted operating range presented in the reach/platform load
diagram of this manual.
The max. allowed platform load is 215 kg.
Inconjunctionwiththerst,i.e.start-upinspection,eachliftissubjectedtoatestloadingwith
an overload of 50% and after that the supporting structures are thoroughly inspected.
4.3.18. Inspection of the anti-corrosion treatment
Ifneeded,repeattheanti-corrosiontreatmentusinge.g.Tectyl210Ranti-corrosionagent.