EasyManua.ls Logo

DLab Digital - Trial Run

DLab Digital
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
5. Trial run
Make sure the required operating voltage and power supply voltage match.
Ensure the socket must be properly grounded.
Plug in the power cableensure the power is on and begin initializing.
Add the medium into the vessel with an appropriate stirring bar.
Place vessel on the work plate.
Set the target stirring speed and begin.
Observe the stirring bar and LCD display (digital model).
Set the target temperature and start heating.
Observe the real temperature on LCD display (digital model).
Stop the heating and stirring functions.
If these operations above are normal, the device is ready to operate. If these
operations are not normal, the device may be damaged during transportation,
please contact manufacturer/supplier for technical support.
Warning !
Forbid to transfer the vessel when the instrument working.
DOMINIQUE DUTSCHER SAS

Related product manuals