EasyManua.ls Logo

Doosan D60S-7 - Towing Information

Doosan D60S-7
261 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Section
177
Transportation Hints
Lift Truck Shipping
Check travel route for overpass clearances. Make
sure there is adequate clearance if the lift truck
being transported is equipped with a high mast,
overhead guard or cab.
To prevent the lift truck from slipping while loading,
or shifting in transit, remove ice, snow or other
slippery material from the loading dock and the truck
bed before loading.
NOTICE
Obey all state and local laws governing the height,
weight, width and length of a load.
Observe all regulations governing wide loads.
NOTICE
Remove ice, snow or other slippery material from
the shipping vehicle and the loading dock.
Typical Example
Always block the trailer or the rail car wheels before
loading the lift truck.
Position the lift truck on the truck bed or the rail car.
Apply the parking brake and place the transmission
control in NEUTRAL.
Turn ignition switch to the OFF position and remove
the key.
If LP equipped, remove the LP fuel tank.
Block the wheels and secure lift truck with tie downs.
Machine Lifting and Tie down
Information
NOTICE
Improper lifting or tie downs can allow load to shift
and cause injury and/or damage.
1. Weight is given on the serial plate.
2. Use proper rated cables and slings for lifting.
Position the crane for level lift truck lift.
3. Spreader bar widths should be sufficient to
prevent contact with the lift truck
4. Use the tie down locations provided for lift truck
tie down.
Check the state and local laws governing weight,
width, and length of a load.
Contact your DOOSAN Lift Truck dealer for shipping
instructions for your lift truck.

Table of Contents

Related product manuals