Operating & Maintenance Manual Maintenance
86
Initial
500
miles/
850 km
Daily Weekly Monthly
3
Monthly
250 hrs.
6
Monthly
500 hrs
12
Monthly
1000 hrs
Scavenge line C
Pressure system C
Engine breather element C
Pressure gauge C
Pressure regulator C
Separator tank (2) exterior CR
Lubricator (Fill) C
2 Yrs 4 Yrs 6 Yrs
Safety valve C
Hoses R
Separator tank (2) interior C
*Disregard if not appropriate for this particular machine
(1) or 3000 miles/5000km whichever is the sooner
(2) or as defined by local or national legislation
C = Check (adjust, clean or replace as necessary)
CBT = Check before towing.
CR = Check and report
D = Drain
G = Grease
R = Replace
T = Test
W I = or when indicated if earlier.
Refer to specific sections of the operator's manual for more information