EasyManua.ls Logo

Dremel 3D20 - Getting Ready to Build; Filament Spool Mounting and Threading; Build Platform Preparation; Initial Power-Up and Filament Load

Dremel 3D20
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GETTING READY TO BUILD
!
WARNING
OBSERVE ALL PROVIDED
WARNINGS AND SAFETY
INSTRUCTIONS WHEN USING THE DREMEL 3D20.
FAILURE TO DO SO MAY RESULT IN FIRE,
EQUIPMENT DAMAGE, PROPERTY DAMAGE OR
PERSONAL INJURY.
1. Ensure the power switch is in the off position.
2. Remove the Dremel 3D20 lid for better access to
extruder and build platform.
3. If build platform is installed, remove by pinching the
clamp located at the front of the build platform and
lifting the build platform off the base.
PRESS
LEFT
4. Mount lament spool to spool holder and secure
with with spool lock.
a. Place lament spool onto spool holder with
spool being fed from the bottom towards the
back of the Dremel 3D20.
End of lament
b. Insert spool lock into spool holder and rotate 90
degrees to lock in place.
5. Thread lament through lament guide tube. The
lament can then be inserted into the extruder
intake (Manual Image 8-10). This will ensure the
extruder experiences minimal resistance while
building.
Filament guide
6. Place Build Tape over Build Platform.
7. Install the build platform using the build platform
clip to secure.
8. Plug power cord into outlet and turn on Power
Switch (Dremel 3D20 will take approximately
30 seconds to properly warm up).
9. Tap “Tools” on your Dremel 3D20’s touch screen
then tap “Filament”, then tap “Load Filament”.
10. Insert the lament coming from the lament guide
tube into the extruder intake (top). Tap “Next”.
19

Table of Contents

Other manuals for Dremel 3D20

Related product manuals