EasyManua.ls Logo

Duke FBB-NC-120 - INSTALLATION INSTRUCTIONS; Qualified Personnel Requirements

Duke FBB-NC-120
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Installation and Operation of Flexible Batch Broiler
II. INSTALLATION INSTRUCTIONS
A. QUALIFIED PERSONNEL
Theseinstallationinstructionsarefortheuseofqualied
installation and service personnel only. Installation or
servicebyotherthanqualiedpersonnelmayresultin
damage to the broiler and/or injury to the operator.
Qualied installation personnelare those individuals,
rms,companiesorcorporationswhicheitherinpersonor
through an agent is engaged in and responsible for:
The installation or replacement of gas piping or
theconnection,installation,repairorservicingof
equipment, who are experienced in such work,
familiar with all precautions required, and have
complied with all requirements of state and local
authorities having jurisdiction. See: National Fuel
Gas Code NFPA 54 (ANSI Z223.1).
The installation of electrical wiring from the electric
meter, main control box or service outlet to the
electricalappliance.Qualiedinstallationpersonnel
must be familiar with all precautions required and
have complied with all requirements of state and
local authorities having jurisdiction. See: National
ElectricalCode,ANSI/NFPA70.
This appliance is not intended for use by persons
(includingchildren)withreducedphysical,sensory
or mental capabilities, or lack of experience
and knowledge, unless they have been given
supervision or instruction concerning use of
the appliance by a person responsible for their
safety.
Theinstallationmustconformwithlocalcodes,orin
theabsenceoflocalcodes,withtheNationalFuelGas
Code,ANSIZ223.1/NFPA54,ortheNaturalGasand
PropaneInstallationCode,CSAB149.1asapplicable,
including:
The appliance and its individual shutoff valve must
be disconnected from the gas supply piping system
during any pressure testing of that system at test
pressures in excess of ½ psi (3.5 kPa).
The appliance must be isolated from the gas supply
piping system by closing its individual manual
shutoff valve during any pressure testing of the
gas supply piping system at test pressures equal
to or less than ½ psi (3.5 kPa).
For a broiler mounted on casters, the installation
shall be made with a connector that complies with the
StandardforConnectorsforMovableGasAppliances,
ANSI Z21.69/CSA 6.16 and a quick-disconnect device
that complies with the Standard for Quick-Disconnect
DevicesforUsewithGasFuel,ANSIZ21.4/CSA6.9.
When installing the broiler with casters and quick-
disconnecthose,adequatemeansmustbeprovided
to limit the movement of the broiler without depending
on the connector and the quick disconnect device or
its associated piping to limit the broiler movement. A
means for restraining may be attached to the vertical
portion of the base frame in the rear of the broiler.

Related product manuals