EasyManua.ls Logo

Duke FBB-NC-120 - Delivery and Inspection Procedures

Duke FBB-NC-120
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Operation of Flexible Batch Broiler
8
B. DELIVERY AND INSPECTION
Duke Manufacturing Co. does everything within its
power to insure you received your broiler in good
condition. They are strapped down on heavy wooden
skids and packed to prevent shipping damage. They
have all been carefully inspected before they were
packaged and consigned to the carrier.
Upon delivery of your Duke broiler:
• Lookovertheshippingcontainer,carefullynotingany
exteriordamageonthedeliveryreceipt,whichmust
also be signed by the driver/ delivery person.
• Unpackandcheckforanydamage,whichwasnot
evident on the outside of the shipping container.
• Check for concealed damage. The carrier must be
notiedwithinfteen(15)daysofthedeliveryof
thebroilerandthecarton,skidandallpackaging
materials must be retained for inspection.
Duke Manufacturing Co. cannot assume liability for
loss or damage suffered in transit. The carrier assumes
full responsibility for delivery in good order when the
shipmentwasaccepted.However,wearepreparedto
assistyouinlingyourclaim.
2
3
5
4
6
7
4
4
5
8
Caution: The broiler is very heavy!
Use adequate help when lifting.
1) Usingautilityknife,cutawayplasticwrap(Notshown).
2) Remove the top cardboard and inner cap.
3) Remove Training Material Box
4) Remove cardboard from the corners (4 places).
5) Remove cardboard on the ends (2 places).
6) Remove banding straps (Cut with utility knife or scissors:
5 places).
7) Remove box of attachable parts & accessories from the front.
8) Safely lift one end of broiler and tap block towards center and
then sideways to remove. Repeat for remaining blocks. This
allows casters to touch the pallet.
9) Remove the broiler from the shipping pallet using 3 people to
guide and distribute it’s weight (approx 335 lbs) accordingly.
While carefully supporting the broiler. Roll it forward until the
front casters are clear of the pallet. Lift the broiler 6-8 inches
aboveandawayfromthepallet,andgentlyplaceonoorto
avoid damage to casters.
10) Remove protective blue tape from broiler panels, double
checking that no tape remains.