PROCEDURE FOR THE ADJUSTMENT AND TESTING OF THE LIFT
RES
ERVED FOR THE INSTALLER TECHNICIAN
(to be carried out scrupulously by the installer at every point)
• AD
JUSTMENT OF MECHANICAL ALIGNMENT OF TROLLEYS
1. press the up button and check the correct direction of rotation of the motor (the carriages must rise)
otherwise change two phases on the terminal board.
2. lift the carriages to about 50 cm and measure the height. If there is a difference, tension the synchronism
cables.
• TESTING OF THE LOADING BRIDGE FUNCTIONS
• CHECKING OF THE DEVICE AND SAFETY LIMIT SWITCH TENSIONING CHAIN (FC1 / FC2)
• CHECK THE CORRECT OPERATION OF EM1 / EM2 ELECTROMAGNETS, POSSIBLE TO ADJUST NEW
• VERIFY CORRECT LUBRICATION OF MOVING ORGANS
• VERIFY THAT THE VALVE OF MAXIMUM IN CENTRAL UNIT DOWNLOADS TO HIGH MECHANICAL
FINECORSA
• CHECK THAT THE ARM LOCKING SAFETY RACKS LAYS IN THE VARIOUS POSITIONS (ARM OPEN ALL
OPEN AND ARM ALL CLOSED)