EasyManua.ls Logo

E.T. Systems UMPETHA - Motor Positioning to Gate

E.T. Systems UMPETHA
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UMPETHA 082009/072010.014
9
Motor positioning to gate.
Hot tip: Cast the track plinth at the same time as the motor plinth
Install the base plate on the protected side of the driveway wherever possible. (opposite side of the guide post to the driveway) The base
plate must be installed 30 to 50mm away from the proudest part of the gate. The wheel bolt is the proudest part of the gate here. If in doubt
rather install the base plate further away and use spacers between the gate fascia and the rack when installing the rack.
30 to 50mm between the proudest part of the
gate and the edge of the base plate
Guide post
Driveway
300mm
200mm
300mm
300mm
Base plate
Conduiting
Pre-cast concrete
plinth
Coach screws through
angle mounting tabs
10mm masonry drill bit.
Freshly cast concrete
plinth
Conduiting
Roofing bolts pre-
assembled onto base
plate
Base plate
Fold out tabs
Top view
Sectional side view of a baseplate set in a freshly cast plinth
Sectional side view of a baseplate mounted on a previously cast plinth

Related product manuals