EasyManua.ls Logo

Eaton CEAG ZB-S Series - Webmodule

Eaton CEAG ZB-S Series
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56
Technical data
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
4.4.14 Webmodule
Conform to: EN 60950-1. Developed, manufactured and
tested acc. to ISO 9001.
Technical data
Supply voltage 24 V DC
Power consumption 1 W
Current consumption 33 mA +/- 25%
Connection RJ45
Insulation class III
Degree of protection acc�
to EN 60529
IP 20
Ambient temperature
-10 °C �� +55 °C
Connection terminal 1�5 mm²
Weight 0,55 kg
Dimensions 90 x 35 x 32 mm
Description / Scope of application
The webmodule CG-S for visualisation and monitoring
of a ZB-S system, AT-S
+
system or of a LP-STAR system
(seperate mounting instructions) or via local ethernet
(LAN) with a customary WEB-browser (e. g. Internet
ExplorerTM). Integrated mail-client for a comfortable
and event based failure notification for up to 5 email
addressees. Password protected access accounts capable
of parametrisation.
Mounting
Pay attention to tempera-tures outside the permitted
range during operation. The permissible ambient
temperature may not exceed 55°C.
The module was designed for DIN rail mounting (2TE) to
be only mounted in the cabinet. An external mounting
outside the LP-STAR Unit is not permitted.
Electrical connection
Status/
Failure LED
+ - PE
24 V DC from
DC/DC converter
Service
Pin
Connection
of the 6-pole
data cable to
the control
unit CSU
Network
connection
RJ45
Connection to the CU (ZB-S / AT-S
+
)
To connect the webmodules Six-pole data cable to the
CU, the housing of the CU must be opened via both
spring retainers.
The plug of the Six-pole data cable must be connected
to the circuit board as shown in the photo below. Please
note the cable leading out of the housing.

Table of Contents

Related product manuals