68
6 Installation
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
Subrack 1 (with modules fitted) and subrack 2 (with 8 free slots)
Pos. 1: plugin terminal block with the module connections
(fitted)
Pos. 2: lower fixing (pivoted locking pin) for the SKU
module
Pos. 3: plugin terminal block with the module connections
(removed)
Pos. 4: socket for modules
Pos. 5: upper retaining screw for the cover (pos.6)
Pos. 6: cover for terminals (L, N, + and – and other socket
connections) of subrack 2
6.8 Connection of the emergency lighting
Maximum pipeline length in the final circuit based on the
STAR and CG protocol – For a safe communication in the
final circuit, the line impendaces and pipeline length shown
in the table, don´t be allowed to pass nominal load.
Type Cable cross-
section (mm
2
)
Maximum line
impedance (Ω)
*Maximum
pipeline length (m)
SKU CG-S 1x6A 2,5 5,2 450
SKU CG-S 2x3A 2,5 10,4 900
SKU CG-S 4x1,5A 2,5 20,8 1800
SKU CG-S 1x6A 1,5 5,2 275
SKU CG-S 2x3A 1,5 10,4 550
SKU CG-S 4x1,5A 1,5 20,8 1800
*ATTENTION! The in the table shown pipeline length don´t
conside the power failure and turning-off terms of the final
circuit fuse at fault, but exclusive the luminaires communi-
cation with the ZB-S at mains- and batterie operation.