EDR-5000 IM02602007E
Commissioning: Power Factor
Object to be tested:
Testing the projected Power Factor Modules.
Necessary means:
Three-phase AC voltage source;
Three-phase AC current source; and
Timer.
Procedure – Testing the wiring:
Feed the rated voltage and rated current to the measuring inputs of the relay.
Adjust the current pointers 30° lagging to the voltage pointers.
The following measuring values have to be shown:
P = 0.86 Pn
Q = 0.5 Qn
S = 1 Sn
If the measured values are shown with a negative (algebraic) sign, check
the wiring.
In this example, the PF-Trigger is set to 0.86 = 30° (lagging) and the PF-
Reset is set to 0.86 = 30° (leading).
Carry out the test with the settings (trigger and reset) that fit the
switchboard.
Testing the threshold values (Trigger) (PF Trigger: Example = 0.86 lagging):
Feed the rated voltage and rated current in phase to the measuring inputs of the relay (PF=1).
Adjust the angle between the voltage and current (current pointer lagging) until the relay picks up.
Write down the pickup value.
Testing the Reset (PF Reset: Example = 0.86 leading):
Reduce the angle between voltage and current beyond PF = 1 (current pointer leading) until the alarm drops
off.
Write down the reset value.