EasyManua.ls Logo

Ecosoft CROSS 90 - Filter Indicators; Filter Installation; Before Commencing Installation

Ecosoft CROSS 90
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
EN
INSTALLER AND USER GUIDE FOR CROSS 90 DIRECT FLOW REVERSE OSMOSIS FILTER
This manual is the intellectual property of Ecoso. Copying and reprinng is prohibited. © 2023
2. SPECIFICATIONS AND COMPONENTS
3. FILTER INSTALLATION
2.4 REVERSE OSMOSIS FILTER INDICATORS
1 System performance indicator - making water indicaon, water quality indicaon, faults
indicaon, ushing indicaon
2 – RO replacement lter lifeme indicator
3 – CB replacement lter lifeme indicator
4 – CF replacement lter lifeme indicator
5 Faucet indicator - making water indicaon, faults indicaon, replacement indicaon, ushing
indicaon
5
Before installing a domesc reverse osmosis lter please carefully read this instrucon.
This system must be installed in compliance with local codes.
3.1 BEFORE COMMENCING INSTALLATION
1) Check that all parts are in the package. Do not open the plasc bags with lter parts before you
make sure everything is in place to be able to return faulty/incomplete package.
2) Check conformity of your local variables to requirements specicaons:
Main pressure* Supply water temperature*
Check water pressure at mains before install-
ing the product. Compare to the requirements
in paragraph (2.1).
Check temperature of supply water. Compare
to the requirements in paragraph (2.1).
*Refer to paragraph 2.1 for recommended measures in case any of the above variables
does not meet the requirements.
1
2
3
4

Table of Contents

Related product manuals