EasyManua.ls Logo

EDAN FTS-3 - Chapter 9 Modules Malfunction Verification; 9.1 Verifying Malfunction of the Main Board

EDAN FTS-3
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FTS-3 Fetal Telemetry System Service Manual Modules Malfunction Verification
- 25 -
Chapter 9 Modules Malfunction Verification
When a module is suspected of malfunction, verify it with the method described in this chapter.
NOTE:
For all the interfaces, the first pin is the one with a square solder pad.
9.1 Verifying Malfunction of the Main Board
To verify the main board,
1) Open the base station using the procedures described in section 10.3.
2) Switch on the base station. (Powered by AC or battery.)
3) Measure the voltage to earth of the pins listed below, using a multimeter:
Item
Pin
Reference result
1
TP1
+5V5 (4.95~6.05) V
2
TP4
+3V2.7~3.3V
3
TP5
+2V5 (2.25~2.75) V
4
TP9
RF_3V32.97~3.63V
5
TP10
VCC (2.97~3.63) V
6
TP11
+5V (4.5~5.5) V
Figure 9- 1 Main Bboard
理邦保密文件
EDAN CONFIDENTIAL

Table of Contents

Related product manuals