EasyManua.ls Logo

Edge-Core ECS4310-18T

Edge-Core ECS4310-18T
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C
HAPTER
3
| Installing the Switch
Equipment Checklist
– 39 –
EQUIPMENT CHECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
PACKAGE CONTENTS
Gigabit Smart Switch (ECS4310-18T)
Bracket Mounting Kit (two rack-mounting brackets and eight screws)
Four adhesive foot pads
Power Cord—either US, Continental Europe or UK
Installation and Management Guide CD
OPTIONAL RACK-MOUNTING EQUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)

Table of Contents

Related product manuals