EasyManuals Logo

Edge-Core ECS4310-18T User Manual

Edge-Core ECS4310-18T
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
C
HAPTER
3
| Installing the Switch
Equipment Checklist
– 39 –
EQUIPMENT CHECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
PACKAGE CONTENTS
Gigabit Smart Switch (ECS4310-18T)
Bracket Mounting Kit (two rack-mounting brackets and eight screws)
Four adhesive foot pads
Power Cord—either US, Continental Europe or UK
Installation and Management Guide CD
OPTIONAL RACK-MOUNTING EQUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Edge-Core ECS4310-18T and is the answer not in the manual?

Edge-Core ECS4310-18T Specifications

General IconGeneral
BrandEdge-Core
ModelECS4310-18T
CategorySwitch
LanguageEnglish

Related product manuals