CET Electric Technology
51
5.8.4 Setpoints Setup
1=Over Setpoint
2=Under Setpoint
1=Over Setpoint
2=Under Setpoint
Table 5-28 Setpoint Setup Parameters
Notes:
1) The PMC-33M-A provides the following setpoint parameters:
kvar Total Present Demand
Current (Any Phase
Current)
kW Total Predicted Demand
kvar Total Predicted Demand
kVA Total Predicted Demand
Table 5-29 Setpoint Parameters
2) For Over Setpoint, the setpoint parameter must exceed the Over Limit to become active and go
below the Under Limit to become inactive.
For Under Setpoint, the setpoint parameter must go below the Under Limit to become active and
exceed the Over Limit to become inactive.
3) The PMC-33M-A provides the following Setpoint Triggers:
Table 5-30 Setpoint Triggers
4) When the Setpoint Parameter is set to Phase Reversal, the Setpoint Type must be set to 1 (Over
Setpoint), and there is no need to set Over Limit and Under Limit. Please be informed that the
Phase Reversal Setpoint assumes that the phase sequencing is based on Positive or Clockwise
rotation (ABC).