E F A P O W E R EV- H C - I N S T A L L A T I O N A N D U S E R M A N U A L
8 | 28
On locations with harsh weather conditions (high temperatures, heavy dust, snow and/or very low temperatures)
it’s recommended to provide additional protection, either inside a building or a shelter, or providing a roof
protection for the Unit. See example in Figure 6.
Figure 6 - EFAPOWER EV-HC with roof protection
5.1.2 SITE VERIFICATION AND INSPECTION
Check if Home Charger Station layout site is compliant with the specified clearance around the box;