EasyManua.ls Logo

efacec EFAPOWER EV-QC45 - Handling and Placing

efacec EFAPOWER EV-QC45
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11/32
5.3 HANDLING AND PLACING
IMPORTANT: Before installing stations
The instructions provided in this manual assume that the appropriate wiring, circuit protection, and metering
are in place at the installation location.
To assist in the process of preparing the installation site, it is recommended that before you begin installing
Quick Charging Station, you thoroughly review the contents of this document to familiarize yourself with the
required installation steps.
In case of any doubt regarding items described in this guide, please contact us at:
5.3.1 PACKAGING
EFAPOWER EV-QC45 is shipped in a package with the following dimensions (WxDxH):
1150x850x2150mm (45.3x33.5x84.6 inches)
5.3.2 VISUAL INSPECTION
Check if the exterior packaging has been damaged by mechanical impacts or any accidents during
transportation
If applicable, check if the exterior panels of the EFAPOWER EV-QC45 are in perfect condition
Check if the interior of the Quick Charger Station is clean
Check if the door of the Quick Charger Station is working properly
Check for proper Quick Charger Station protective ground connection point, which should be
interconnected with the low voltage switchboard ground connection during the installation
Power
cabinet
Electronic Power Systems Unit
Rua Eng.º Frederico Ulrich - Apartado 3078
4471-907 MOREIRA MAIA - PORTUGAL
Tel: (+351) 229432248 - Fax: (+351) 229403209
apv-sa@efacec.com
www.efacec.com
Electronic Power Systems Unit
2725 Northwoods Parkway, Ste. B
Norcross, Georgia 30071 USA
Tel: (1) 470 395-3648 -
Fax: (1) 770 446 8920
support.eem.usa@efacec.com
www.efacecusa.com

Related product manuals