EasyManua.ls Logo

ElectrIQ IQOOL-SMART12HP - INSTALLATION; Tools Required for Installation

ElectrIQ IQOOL-SMART12HP
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
6
TOOLS REQUIRED
SPIRIT LEVEL
TAPE MEASURE
DRILL
180mm CORE DRILL
8mm MASONRY DRILL BIT
PENCIL
BEFORE STARTING INSTALLATION, PLEASE ENSURE YOU HAVE ALL SUITABLE EQUIPMENT
AVAILABLE AND UNDERSTAND THE STEPS INVOLVED IN INSTALLATION. IF IN ANY DOUBT,
PROFESSIONAL ADVICE SHOULD BE SOUGHT.
THE INSTALLER MUST ENSURE THAT THE PLANNED POSITION OF THE AIR CONDITIONER IS
SUITABLE, AND THAT THERE ARE NO CABLES, PIPES OR OTHER OBSTRUCTIONS, WHICH
WOULD PRESENT A DANGER AND/OR PREVENT COMPLETION OF INSTALLATION.
20mm MASONRY DRILL BIT
SHARP KNIFE

Related product manuals