Installation - electric, steam and gas heating
487 18 39 01 - 300/500/750 - GB
31
The tumble dryer must be given a fuse group of
its own.
Connecting the cable:
Remove the top plate at the back of the tumble
dryer to connect the cable through cable glands A
to terminal strip (C).
Cable dimension:
For calculation of the connection cable dimen-
sion, please refer to local guidelines.
Fuse size and effect are given on the pages to follow.
Function check, see next page.
(NB: Correct direction of rotatio
n is important!)
The tumble dryer must be equipped with sup-
plementary protection in accordance with
heavy current regulations.
Electric installation 300/30 - 500/50
To be carried out by qualified personnel