35
Page
Joins can be taped
together using aluminum
foil self adhesive tape.
Insulation may be fitted
prior and after the inline
powerflue fan.
Failure to fit insulation on the exhaust flue may result in
condensation failures with the appliance.
Insulation to be run for the first 3m from the appliance. For
flue runs shorter than 3m, discard extra insulation.
Connect power lead to
fan module. Ensure lead is
clipped to support where
required.
Do not use connection to
support lead.
Fit air intake flue pipe to
heater connection.
Cut tube to length where
required.
Ensure ends are burr free
and round, test fit flue will
slide over connection.
Apply an 8mm thick silicon
bead fully around heater
connection approx. 10mm
from the top.
Apply an 8mm silicon
bead fully around the
inside of the flue end
(heater connection end)
Fit flue clamp over flue
(loosely).
Slide flue onto connection
spigot fully.
Tighten clamp fully.
Wipe excess silicon,
visually check connection
to ensure connection is
fully sealed
Clip flues as required to
provide adequate support.