86
Page
Ensure ends are burr free
and round, test fit flue
will slide over connection
joiner.
Apply an 8mm thick silicon bead fully around both ends
of connector approx. 10mm from the ends.
Flexi flue is provided for air
intake. A maximum of 2 x
7m lengths can be used.
Cut tube to length where
required.
Ensure ends are burr free
and round, test fit flue will
slide over connection.
INTAKE PIPE CONNECTION TO APPLIANCE
Intake pipe joiner connection
Apply an 8mm silicon
bead fully around the
inside of the flue end
(heater connection end)
Fit flue clamp over flue
(loosely).
Apply an 8mm silicon
bead fully around the
inside of the flue end
Fit flue clamp over flue
(loosely).
Recommended Silicon
– Non-acetic, neutral
cure 150°C or higher
temperature rated.
Bostik RTV 926 or similar.
Apply an 8mm thick silicon
bead fully around heater
connection approx. 10mm
from the top.
Slide flue onto connection
spigot fully.
Tighten clamp fully.
Wipe excess silicon,
visually check connection
to ensure connection is
fully sealed