Unpacking
We appreciate that you have decided to purchase our Products and we would
like to ask you to begin the installation by checking your delivery against the
Packing List. Please make sure to check the box for external damages before
opening. If you find external damages, which have also led to damages to the
Flow Monitor inside, you should contact the forwarder/shipper to claim repla-
cement (or the cost of replacement). Check the Monitors’ identification tag
against your purchase order to make sure you have got the right parts with
the right specifications.
All Monitors are individually packed in plastic bags and put into the box eith-
er two by two or individually in each box. The plastic bag is to prevent foreign
particles to get inside the Pipe Section, which could prevent proper function of
the Flow Monitor after the installation.
The box is made from recycled environmental friendly material and we kindly
ask you to deal with the waste material in a way that will have as little impact
on the environment as possible.
Procedures before Installation
Note!!! Before any installation or maintenance work, disconnect all
electrical power!
Please check that you are going to mount the Monitor at the lowest point in the
piping system if you are measuring liquids and at the highest point if you are
measuring gases. Also check if the planned flow direction in the system mat-
ches the one indicated on the Monitor. There is a red flow direction arrow on
the outside of the pipe section (not the Stainless Steelmodels which have a
marking engraved on the side). If you find this to mismatch, we refer to sec-
tion 3.4 ”Change of Flow Direction”, to adjust the internal flow director in or-
der to match the desired flow direction. Change of the flow direction on the
Stainless Steel Pipe Sections (FSS/GSS) is not possible in the field without
ordering a new Pipe Section and we kindly ask you to contact your local re-
presentative or Eletta Flow AB, Sweden for help.
Check that the pipe section has the right threads or the right flange standard to
match your piping or counter flange.
If you are using the separate/remote execution i.e. Pipe Section and Control
Unit installed in different locations, please check the plastic hoses for any da-
2
2.1
2.2
2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eletta S2 and is the answer not in the manual?

Eletta S2 Specifications

General IconGeneral
BrandEletta
ModelS2
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals