5. Set up, installation, putting into service EN
12.7.23 V2.1 17 / 24
5. Set up, installation, putting into service
5.1 Installation
WARNUNG!
.
Danger due to electrocution!
Incorrect installation of connections may result in irreversible personal
injury or death.
The Safety evaluation unit may only be installed by specially trained,
authorised personnel.
Only use the Safety evaluation unit if it is not damaged.
Avoid hitting the housing. If possible, protect housing using additional
measures (enclosure).
5.1.1 Control output
The control output (terminals 24 to 26) indicate the status of the safety out-
puts:
• When the safety output is switched through, contacts 25 and 26 are clo-
sed.
• When the safety output is switched off, contacts 24 and 26 are closed.
Make sure that the control output is only used for indicating the operating
status of the safety evaluation unit.
5.1.2 Mounting position
ACHTUNG!
.
Danger due to errors during electrical connection!
Electronic components can be destroyed, thereby resulting in malfunctio-
ning of the machine, and hence, injuries to personnel or property damage.
Please find and comply with the electrical data in the respective data
sheet.
Signal path of the output signal is generally depicted on the data sheet
or is made available by elobau on request.
Please pay attention to temperature drift.
Installation of the Safety evaluation unit is only permitted in a voltage-
free state.