Installation, Operation, Commissioning and Maintenance
DC Power Supply System
Integrated Applications
Introduction
o The Smartpack based Product Range (2 )
o Brief System Description ⎯ Minipack (2 )
Appendix
Communication
o Installing PowerSuite – PC software (13)
o CAN Bus Termination and Addressing (14)
AC Mains
o External AC Fuses ~ Recommended Rating (15)
o Mains Feeds versus Rectifier ID (16)
Battery Monitoring
o 48V Battery Symmetry Connections ~ Controller (17 )
o 48V Battery Symmetry Connections ~ Battery Monitor (18-19)
o Battery Interface Card ~ Terminals & Pin-out, ( 20)
Alarms & Monitoring
o Standard Alarm Relays & Digital Inputs (21)
o Alarm Interface Card ~ Terminals & Pin-out (21)
o Alarm Interface Card, Extended ~ Terminals & Pin-out (22)
o Alarm Interface Card, External ~ Terminals & Pin-out (22)
Internal Connections
o System Interface Card ~ Terminals & Pin-out (23)
o LVD Latching Contactors (23)
CAN Bus Nodes
o Battery Monitor CAN Node ( 24)
o Load Monitor CAN Node ( 25)
o I/O Monitor CAN Node ( 26)
Drawings
o Schematic Diagram Minipack 48VDC, 3.2kW (29)
o Schematic Diagram Minipack 48VDC, 4.8kW (30)
Check Lists pullout forms
o Installation Check List
o Circuit Distribution List
o Commissioning Procedure
o Maintenance Procedure
Installation
o Installing Smartpack and Rectifier Modules ( 3)
o Installation and Maintenance Details
⎯ Opening or Closing the Minipack Drawer Shelf (4)
⎯ Mounting or Removing Minipack Blind Covers (4)
⎯ Removing or Mounting Load MCBs (5)
⎯ Configuring Priority and Non-Priority Load Circuits (5)
o Installation steps; mechanical, electrical (6-7)
o Location of Components, GA drawing; 6 and 4 rectifiers systems (8)
o Connections, Factory Settings, etc. (9)