Flatpack2 PS System, SP2
356825.103
Quick Start Guide
Installation, Operation, Commissioning and Maintenance
Smartpack2-based, DC Power Supply System
Integrated 4U Distribution, Cabinetized and Outdoor Applications
Introduction
o The Smartpack2-based Product Range (2 )
o Brief Description, Smartpack2-based System (2 )
Commissioning
o Pre-start check (8 )
o Commissioning steps, Startup (8-9)
Operation
o Front keys and display, Controller Access via PC (10 )
o Software Menus – Smartpack2 Master Controller ( 11)
Appendix
Communication
o CAN Bus Termination and Addressing (12 )
AC Mains
o External AC Fuses, Recommended Rating ( 13)
o Identifying Power Shelves, 4AC, 2AC or 4AC-3kW (14 )
o I. Individual AC Mains Terminals ~ NOT Reconfigurable (14 )
o II. AC Mains Terminal Block ~ Reconfigurable (15 )
o III. AC Terminal Block with SPDs ~ NOT Reconfigurable (16 )
o About AC, DC Earthing Systems ( 17)
o Mains Phases vs. Rectifier ID – Phase Balancing & Monitoring (18-19)
Battery Monitoring
o Battery Monitor’s 48V Symmetry Connections (20-21)
Internal Connections
o Standard Alarm Relays & Digital Inputs – Connections ( 22)
o LVD Latching Contactors – Connections ( 22)
o Replacing Smartpack2 Basic Controller, inside- or top cover-mounted…(23)
CAN Bus Nodes
o Battery Monitor CAN Node (24 )
o Load Monitor CAN Node ( 25)
I/O Monitor and I/O Monitor2 CAN Nodes (26 )
Check Lists pullout forms
o Installation Check List
o Circuit Distribution List
o Commissioning Procedure
o Maintenance Procedure
Installation
o Installing Rectifiers & Opening Smartpack2 Master ( 3)
o Installation steps; mechanical, electrical (4-5)
o Location of Components, GA Drawing (6 )
o Connections, Factory Settings, etc. ( 7)